Wednesday, 5 December 2018

PRE-PRODUCTION: UPDATE PITCH


All groups were asked to give an update pitch to explain what's currently happening with the project and if there are any updates. 

My section of the pitch I explained the research I've been doing, the change of filming style, explained the locations both confirmed and unconfirmed and then explained the camera tests that I have done so far, although at the time of this pitch I was still doing the Canon C100 Test. I then went on to show the kit list update and explained that we can't use the Canon 5D Mark 4 as a second camera due to budget. However, prior to giving this pitch, Sam Creamer did suggest testing the Panasonic DVX200 against the Canon C100 as it's a camera that's footage that could match closest. 

With locations,  I explained that it's confirmed that we'll be filming in Tanya's house and around her village. The location that isn't confirmed yet is the location of the performance with Tanya. Jemma really wants a classic theatre but due to budget it doesn't look like we can get one, as well, I'm not confident I could light a theatre on my own. If I had access to the theatre's lighting and control board and their technician then this would all be film. However, if not then I'll have to try and light the theatre with the lights I have available which could be difficult. 
We are looking into the possibility of a club which would be easier to light as it's smaller and would be a better atmosphere. Victoria has contacted a few clubs but it will all depend on the price as our budget isn't large.

No comments:

Post a Comment