Once we had all the interviews set, flights and hotel for Berlin booked up and confirmed all the dates with Kamran. I wrote up the Production Schedule.
We set out on the 25th filming the voice over and all of Kamran's GV's and PTC's in London. We got the voice over here so we had something for the rough cut and agreed we could re-do during post if it was needed.
26th was the section for the Holocaust Survivors. The 27th Myself and some other crew weren't available so we had this as a day with no filming.
28th was our interview with David in Birmingham and after that we weren't to be filming again until the 1st May but due to time constant I had to update the production schedule on the 25th and allocate a time for us to film Kamran's Driving Sequence because Kamran didn't have his car until the allocated date.
I wrote up all of the Berlin dates as well from the 1st - 5th Explaining all the interviews and when writing up the schedule I double checked all the travel times on Google Maps and included them all with the addresses of all the locations to be able to ensure enough time was allocated for the travel, interviews and de-rigs.
No comments:
Post a Comment